Completed migration project from ABB Symphony plus INFI 90 to Siemens Power Plant Automation T3000. My workscope was to migrate the Function Block diagram from ABB Symphony plus to SPPA T3000. It was an exciting project for me and learned a lot.
-
-
-
Completed full installation of ABB Symphony+ Engineering softwar on a new PC using the ABB symphony+ sofware. It was a great experience for me to install this complex software after a week hardwork. It was new experience for me to install ABB Symphony+ Engineering software for the BRC410 and BRC400 controller configuration.
-
Completed full installation of GE iFix 5.5 SCADA software into a new
CPU of a 50 MW engine-based power plant. One HDD of the three SCADA
computers has been damaged. A new HDD has been installed into the old CPU
and all the required SCADA software has been installed in the new HDD.
Commissioned the new CPU with the existing Siemens S7-400H station. Now
the new SCADA computer is working fine. Date: 09 June 2021.
-
Completed full installation of SIEMENS WinCC 7.4 SCADA software into a
new CPU of a 110 MW engine-based power plant. The customer purchased a CPU
as a backup. The SIEMENS WinCC 7.4 SCADA software has been installed in
the new CPU. Commissioned the new CPU with the existing Siemens S7-300
PLC.
-